IBERDROLA 275KV „WINDY HILL“ SUBSTATION
Stop water leaking into the main station
Glasgow
IBERDROLA 275KV
„WINDY HILL“ SUBSTATION
„WINDY HILL“ SUBSTATION
Project information
Stop water leaking into the main substation
Seal cables effectively to prevent the ingress of water at the point of cable entry.
Leaking mastic sealing solution
Leaking mastic sealing solution
Entry point with test installation of 2 seals
Test installation of 2 seals
Installation of HRD 188-1G-1/97
Installation of HRD 188-1G-1/97
Finished installation
SOLUTIONS BY HAUFF-TECHNIK | |
---|---|
Specification
|
Seal cables effectively to prevent the ingress of water at the point of cable entry
|
Requirement
|
Split press seal with a sealing width of 30mm to prevent the ingress of water
|
Products used
|
HRD 188-1G-1/97
HRD 103-1G-1/32 |